The FCA published PS26/6 and the PRA published PS12/26 on 22 April 2026; most Phase 1 SM&CR changes took effect on 24 April 2026. They apply to all solo- and dual-regulated SM&CR firms, including third-country branches; dual-regulated firms must read both statements. Next, FCA improvements to regulatory reporting and processes apply from 10 July 2026, and PRA system changes to long and short Form A and Form E will not be implemented until 10 July.
Phase 1 changes the workflows you already run — 12-week cover, Statements of Responsibilities, Directory, certification, criminal-record checks and regulatory references — even where Connect and PRA Form A/E wording have not caught up.
If you treat 24 April as the whole package you will miss later clocks: 10 July reporting, forms, Enhanced thresholds and overlapping certifications; 30 July Directory cleanup of overlapping certification functions; and 1 September COCON alignment with PS25/23 (named on the PS26/6 next-steps page). Dual-regulated firms also split FCA and PRA reporting of Senior Manager Conduct Rule breaches by people covering an SMF under the 12-week rule.
Operational consequences:
Both regulators say a broader Phase 2 depends on HM Treasury legislation and a later 2026 consultation. Do not put a Phase 2 date in the project plan.
The two policy statements overlap; they are not identical.
| Business type | From 24 April 2026 | Still waiting | Official references |
|---|---|---|---|
| Solo-regulated SM&CR firms | 12-week rule as a submission deadline; Conduct Rules on the cover person; six-month CRC; SoR/MRM six-month notification of the latest version; certification guidance (digital / appraisal cycle); Directory 20/7 split; four-week reference guidance | 10 July 2026: SMF18s at solo firms may hold any prescribed responsibility; Enhanced financial thresholds up 30%; overlapping certification functions removed. 30 July 2026: Directory overlapping-function change. 1 September 2026: remaining PS25/23 COCON pieces | FCA PS26/6; PS26/6 PDF Tables 1–2 |
| Dual-regulated banks, insurers, designated firms (incl. third-country branches) | All of the above plus PRA Rulebook and SS28/15, SS35/15, SS5/21. SMF7 restated (controllers and representatives; PRA may identify SMF7s). Form L for 12-week-rule Conduct Rule breaches. Resolution administrators exempt. Insurers: Key Function Holder uses the SMF application, not a second Form M | PRA Form A and Form E system changes, including CRC validity on those forms, not implemented until 10 July | PRA PS12/26; FCA PS26/6 |
| Enhanced-scope solo firms | Remain Enhanced on current thresholds | Recalculate from 10 July 2026: AUM £65bn; intermediary regulated-business revenue £45m; consumer-credit lending revenue £130m; five-year CPI mechanism | PS26/6 PDF Table 2 |
Operational tip: CRC rules changed on 24 April. The forms will not show the six-month validity until 10 July. Keep a local record of which CRC you relied on.
| Step | Action | What operational staff must deliver | Official reference |
|---|---|---|---|
| 1 | Split the clocks | One-page calendar: 24 April live rules; 10 July reporting/forms/thresholds/overlapping certifications; 30 July Directory; 1 September PS25/23 COCON. Do not mark 10 July items as done | FCA PS26/6 “Next steps”; PRA PS12/26 §§1.23–1.25 |
| 2 | Rewrite the 12-week SOP | 12 weeks to submit a complete SMF application (permanent or interim). Cover person may stay until determination. Conduct Rules from day one | FCA PS26/6 Table 1; PRA PS12/26 §§2.3–2.15 |
| 3 | Route cover-person breaches | Solo: SUP 15 as soon as practicable (not annual REP008). Dual-regulated: PRA Form L from 24 April | FCA PS26/6; PRA PS12/26 §§2.11–2.12, 1.25 |
| 4 | Refresh CRC packs | Six-month validity. No CRC for an existing SMF moving in the same firm or group (PRA: one-month gap allowed). Still do F&P for the new role | FCA PS26/6 Table 1; PRA PS12/26 §§2.85–2.88 |
| 5 | Change SoR/MRM cadence | Notify no later than six months after a significant change; submit the latest version only. Live filing remains allowed | FCA PS26/6 Table 1; PRA PS12/26 §§2.58–2.63 |
| 6 | Recertification and Directory | Digital certificates and appraisal-cycle recertification from 24 April. Directory 20 working days / 7 for leavers. Leave overlapping-function removal to 10 July (rule) and 30 July (Directory); the FCA will strip duplicate Directory roles | FCA PS26/6 Tables 1–2 |
| 7 | References, SMF7, Enhanced | Four-week reference target; incomplete investigations only with reasonable grounds. Dual-regulated: re-run SMF7 against PRA examples — do not paste FCA SMF7 guidance onto a PRA firm. Solo Enhanced: do not drop out on 24 April; the 30% uplift is 10 July | FCA PS26/6; PRA PS12/26 Chapter 3 |
GRT Consulting supports operational teams with:
Contact us for a focused readiness review: T: +44 20 3695 9251 E: info@grtconsult.com Web: grtconsult.com
Sources